Replacement of data-processing system was finished in the second power-generating unit of the South Ukrainian APP.

The reconstruction of the data-processing system was taking place in the framework of technical support project in the field of nuclear safety which was organized by the USA.

During the reconstruction a decision to use the part of the system equipment presenting safety parameters was accepted. This equipment was earlier rendered by the American company to the third power-generating unit of the South Ukrainian APP. Such partial replacement gave the opportunity to reduce the expenses by 2,5 billions USD, "UNIAN" reported.

The same reconstruction of the first power-generating unit was done in 1998. The specialists of the APP dealing with the American equipment for 7 years pointed to the high technical reliability of it.

Спасибі за Вашу активність, Ваше питання буде розглянуто модераторами найближчим часом

1073